Coal mill roll rebuild for a power plant
Power

Coal mill roll rebuild for a power plant

Equipment: coal mill grinding rolls

6,000 h Service life before
14,000 h Service life after
+133% Improvement
1 / yr Unplanned shutdowns

The Challenge

The coal mill grinding rolls was wearing through after only 6,000 h of service, forcing repeated unplanned shutdowns and high spare-part consumption.

Our Solution

We rebuilt the original profile with Grinding Roller & Table Offline Hardfacing Repair, then re-zoned the wear face to match the measured abrasion pattern and verified hardness across every batch.

The Result

Coal mill roll rebuild for a power plant. Service life reached 14,000 h — a +133% improvement — while unplanned shutdowns fell to 0.4 per year and wear cost per tonne dropped accordi

Project Gallery

Discuss a Similar Project All Case Studies